Piping Diagram1. Inside Packing2. Kingston cock cover3. Outside Packing4. Direction of vessel movement5) Seawater strainerThe seawater pump will be da

Pagina 3

1. Seawater pump2. Seawater strainer3. Kingston cock1. W.L.2. Waterlock3. Above seawater line1. W.L.2. Waterlock3. Vacuum valve

Pagina 4

I3-6.] Remote control1) Control cable Use only the single lever remote control device with 1GM 2GM, 3GM and3HM engines.NoteThe dual lever remote contr

Pagina 5 - I. Name of parts

Note1) Fix the wire to the cable clamp of the F.O. filter side.2) Cable connector has M5 thread.2-b)After completing of wiring, check the followingpoi

Pagina 6

1. Remote Control Cable2. M5 Thread3. Operation Lever4. Shaft5. Clutch Case side cover6. Spring joint3-a)-4Move the remote control lever to the forwar

Pagina 7 - III. Engine installation

3-a)-7.Make sure that the angle made between the spring jointand the clutch control lever forms 90 degrees.3-b)Kanzaki-Hurth clutch (for 3GMD and 3HM)

Pagina 8

1. Clamp2. Engine Stop lever3. Engine stop remote control cable[3-7.] Recommended battery capacityUse sufficient capacity of battery.1GM, 2GM, 3GMD -

Pagina 9

IV. After launching1) Check for water or air intake around the gland part of the stern tube and the kingston cockfitting.2) Make sure that the engine

Pagina 10 - Important

V. Fuel and lubricating oil[5-1.] Selection and handling of fuel oil1) Choice of fuel oil Fuel oils available in countries other than those listed abo

Pagina 11

[5-2.] Selection of lubricating oil1) Choice of lube oilThe selection of lube oil is very important to a diesel engine. If an unsuitable oil is used,

Pagina 12 - I3-6.] Remote control

Thank you for purchasing the YANMAR Diesel EngineThis manual describes the various engine parts and prescribes simple checks for normalengine maintena

Pagina 13

V1. Starting the new engine for the first time Important !Before starting the engine for the first time check carefully the followingpreparations.[6-

Pagina 14

FOR 2GM, 3GMD, 3HM1. Oil Supply Port1-b)Check the amount of lobe oil by inserting the dipstick as far as possible. The oil level shouldcorrespond to t

Pagina 15

1. Dipstick2. Empty3. Full1. Oil Supply Port1. Oil Gauge Rod2. Lower Limit3. Upper Limit

Pagina 16

[6-3.] Air bleeding in the fuel systemSee section [9.1] Fuel oil system - 2) Air bleeding in the fuel system.[6-4.] External Inspection1) Thoroughly c

Pagina 17 - IV. After launching

[6-6.] Check of instrument panel alarm systemTurn on the battery switch. Then place the key in the "ON" position and check the conditionof t

Pagina 18 - V. Fuel and lubricating oil

1, Astern2. Neutral3. Ahead4. Control Handle[6-7.] TuningTo allow the lube oil to reach all parts, turn in thefollowing sequence.1) Place the control

Pagina 19

1. Push ButtonDIRECTION OF ROTATION

Pagina 20 - Important !

V II. Method of operationCautionBefore starting the enginereconfirm that there are notools, etc. left in the enginearea, especially areas wherethere a

Pagina 21

1-c)Place the starter key in the "ON" position.1-d)Press the starter button to start the engine.For IGMImportant(1) RELEASE the push buttonw

Pagina 22

2-b)Raise the decompression handle to the "NOCOMPRESSION" position.2-c)Attach the starter handle with priming shaft asthe angle shown in the

Pagina 23

In order to deliver correct parts to you, we need accurate data on the engine you purchased. The information needed is described in the illustrations

Pagina 24

Important1) When running the engine for the first time after launching, run it for15-20 minutes at about 1000 rpm.2) Be sure to break-in the new engin

Pagina 25

3-a)If air is being taken into the cooling water system.3-b)Damage of the cooling water pump.3-c)If dirt has plugged up the cooling water pipe or the

Pagina 26 - DIRECTION OF ROTATION

ImportantClutch life will be significantly shortened if engaged suddenly at high speeds,or if used in a partially engaged condition.10) Abnormal sound

Pagina 27 - V II. Method of operation

ImportantDo not stop the engine with the decompression lever. If the decompressionlever used to stop the engine, fuel will spray out and accumulate on

Pagina 28

4) While the engine is still warm, wipe off any dirt and grime that has accumulated.5) Turn off the battery switch.NoteWhen stopping the engine with t

Pagina 29

V III. Storage[8-1.] StoringWhenever the engine will not be used for several months, use the following procedure toproperly store it.This minimizes co

Pagina 30

ImportantIf wires are wrongly connected the A.C. generator may break.2-c) Terminals must be covered and protected.3) Unseal all openings sealed in ste

Pagina 33

[9-1.] Fuel oil system1) Fuel tank and fuel supply.1-a) Fill the tank up.1-b)Drain the fuel tank every 250 hours of operation.Open the fuel tank drain

Pagina 35

2-e)Loosen the high pressure pipe from the fuel pump. Turn the engine with thestarter motor, and at the same time tighten the cap nut of the high pres

Pagina 36

Check the fuel injection equipment in the following procedure.3-a)Remove the starter motor to check the fuel injection timing mark.Note"IT"

Pagina 37

For 1GM/2GM/3GMDInjection timing mark on flywheel (1T, 2T. 3T)1. Cylinder block side timing mark2. Flywheel3. Crankshaft pulley4. M8 bolt3-f)Remove th

Pagina 38

3-f)-2. The fuel may be bad;ImportantFor the disassembly, adjustment and inspection of the fuel injection pumpand fuel injection valve, consult the ne

Pagina 39

[9-2.] Lubricating oil system1) Engine lube oil1. Engine oil evacuation port1-a)Check the oil level before every operation.1-b)Replace the oil after 5

Pagina 40

ImportantIf the canister is overtightened,difficulty may be experienced inits removal and the filter may bedamaged.2. New Lub. Oil1-c)-6. Start engine

Pagina 41

Location of anticorrosion zinc Number of Pieces1GM 2GM 3GMD 3HMCylinder Head – 1 1 1Cylinder Body 1 1 2 23) Inspection and repla

Pagina 42

ImportantWhen installing the impeller, make sure the direction of the impeller cor-responds to that indicated in the figure.3-b)Adjust the V-belt tens

Pagina 43

[9-4.] Inspection of engine body1) Retightening cylinder head nuts Retighten each nut with a torque wrench before starting anew engine and after 50 ho

Pagina 44

2-b) Crank the engine and set the No. 1 (flywheel side) piston to top dead center (TDC) onthe compression stroke.NoteSet the position at which the val

Pagina 45

I. Name of parts1 Reduction and reversing gear2 Output shaft coupling3 Clutch control lever4 Installation foot5 Engine tube oil dipstick6 Clutch tube

Pagina 46

[9-6.] Electrical equipment1) Checking of the warning lamps on the instrument panel. Check the "ON" and "OFF"function of the warni

Pagina 47

3-b)If the belt needs adjustment, loosen adjusting bolt.Pry away from charging generator (alternator).While holding alternator in position, tighten ad

Pagina 48

2) Clutch control2-a)Checking the operation lever stroke. Move theoperation lever up and down (Ahead and Astern) bydisconnecting the remote control ca

Pagina 49

2-c)Tighten all nuts and bolts After inspection and maintenance, retighten all nuts and boltssecurely.Caution1) Always stop the engine when inspect an

Pagina 54

III. Engine installation[3-1.1 Inspection after unpackingDuring unpacking be careful not to break the engine base. Check the following points:1) Have

Pagina 55

NoteAvoid splashing the flexible mount with water, oil etc.Indication # Installation distance (unit: mm)Engine modelFront Rear A B1GM 70 50 209 3702GM

Pagina 56

1. Gap gauges[3-4.1 Propeller, propeller shaft1) Select a propeller which is suitable for the size and shape of the vessel, as well as for itsintended